Product Image
Product added to your wishlist! View wishlist
Sign in to see your saved products on any device
Product removed from your wishlist! View wishlist
Sign in to see your saved products on any device
Something went wrong. Please try again later.
Product is added to compare already. Please refresh the page.
Product is not found in compare. Please refresh the page.
5 Products already added. Please delete existing selection to add this.

Share this product

FormFlo Concrete Mix: FormFlo P-51, 65 lb Container Size, Bag, 1 day Full Cure Time Model: GRA-401
This product ad may change over time
Share ProductShare

FormFlo Concrete Mix: FormFlo P-51, 65 lb Container Size, Bag, 1 day Full Cure Time Model: GRA-401

Concrete Mix, Color Gray, Container Size 65 lb, Container Type Bag, Coverage 6.6 sq ft @ 1 in, Finishing Features Machinable, Paintable, Sandable, Stainable, Full Cure Time 1 day, Mixing Ratio Not Applicable, Working Time 45 min, Standards ACI 503R, ASTM 143, ASTM 469-02, ASTM 531-05, ASTM 596-01, ASTM C231, ASTM C39, ASTM C66…
Concrete Mix, Color Gray, Container Size 65 lb, Container Type Bag, Coverage 6.6 sq ft @ 1 in, Finishing Features Machinable, Paintable, Sandable, Stainable, Full Cure Time 1 day, Mixing Ratio Not Applicable, Working Time 45 min, Standards ACI 503R, ASTM 143, ASTM 469-02, ASTM 531-05, ASTM 596-01, ASTM C231, ASTM C39, ASTM C666, Application Balconies, Bridges, Concrete Patching, Form and Pour Applications, High Rise Buildings, Marine Structures, Parking Garage, Partial or Full Repairs, Tunnels
See more below
G
Grainger
$46.76
Visit site

Description

Concrete Mix, Color Gray, Container Size 65 lb, Container Type Bag, Coverage 6.6 sq ft @ 1 in, Finishing Features Machinable, Paintable, Sandable, Stainable, Full Cure Time 1 day, Mixing Ratio Not Applicable, Working Time 45 min, Standards ACI 503R, ASTM 143, ASTM 469-02, ASTM 531-05, ASTM 596-01, ASTM C231, ASTM C39, ASTM C666, Application Balconies, Bridges, Concrete Patching, Form and Pour Applications, High Rise Buildings, Marine Structures, Parking Garage, Partial or Full Repairs, Tunnels